Route PY05 — Full feasibility study
Highway geometry, traffic study, pavement design and economic appraisal under SNIP, Paraguay’s public-investment methodology.
- Client
- MOPC · IDB
- Year
- 2023–2024
- Location
- Chaco, Paraguay
- Section assessed
- 179 km
A growing portfolio. Each project is published once its scope, data and images have been validated with the client.
A representative selection by sector. The full portfolio is provided on request for prequalification and tender processes.
Highway geometry, traffic study, pavement design and economic appraisal under SNIP, Paraguay’s public-investment methodology.
Assessment of port conditions, coordination across disciplines and technical interface management.
Detailed design of an urban subdivision: internal roads, platforms, earthworks and utility coordination.
Internal road design for the hospital site: circulation and parking, rigid and cobblestone paving, surface drainage and road markings and signage, with calculation reports and drawings.
Road design for the internal access of the FLUODER SAECA industrial plant in Villeta: connecting road, internal distribution roundabout and maneuvering yard, set out on a drone survey, with pavement structure, drainage, quantities and technical specifications.
Concept design for the terminal: site layout, maneuvering roads, platforms, quantities and budget.
Airside engineering for a business aviation hangar (G650): taxiway and maneuvering apron geometry, geotechnical study and rigid pavement design for apron and taxiway, with obstacle limitation surfaces under DINAC R14 and ICAO.
Aerial survey and surface comparison between flights to verify cut and fill quantities on site.
No projects published in this sector yet. Ask us for references.
We provide the full portfolio with scopes, contracting parties, durations and verified metrics, formatted to the requirements of your process.